Interior Department Expedites Solar Energy Development in the West

 

 

The U.S. Interior Department has instigated initiatives to accelerate the development of solar energy on Western lands. About 670,000 acres currently administered by the Bureau of Land Management (“BLM”) in Arizona, California, Colorado, Nevada, New Mexico, and Utah will be evaluated for the development of large-scale solar energy production. These areas of land will be reserved for solar projects producing 10 megawatts or more of electricity and the goal is to fast-track the permit applications.

Each piece of land is at least 2,000 acres and has been selected for its solar resources, slope, proximity to roads and transmission lines or designated corridors. The evaluation will be funded with Stimulus monies under an ongoing federally-funded evaluation of solar energy development on public lands in six Western States. The evaluation should be completed in late 2010.

Trackbacks (0) Links to blogs that reference this article Trackback URL
http://www.lawofrenewableenergy.com/admin/trackback/143146
Comments (0) Read through and enter the discussion with the form at the end
Post A Comment / Question Use this form to send a comment to the editor. Please do not include any information that you or someone else considers to be confidential in nature. Without prior establishment of an attorney-client relationship, unsolicited messages containing confidential information cannot be protected from disclosure.







Remember personal info?
Send To A Friend Use this form to send this entry to a friend via email.