Solar Energy Development on U.S. Bureau of Land Management Lands: Opportunities and Obstacles Created by Shifting Legal Sands

A legal update from our colleagues, Aaron Courtney, Michael O'Connell & Jake Storms:

Unlike other types of energy development on lands administered by the U.S. Bureau of Land Management ("BLM") (e.g., wind, geothermal), solar energy has consistently encountered significant delays caused in large part by a regulatory authorization system that has yet to catch up to industry demand. ]

In an effort to streamline the analysis of solar energy developers seeking right-of-way grants from BLM, the agency, together with the U.S. Department of Energy, has proposed a draft Programmatic EIS for Solar Energy Development that could have significant implications for solar project development on BLM lands in Arizona, California, Colorado, Nevada, New Mexico and Utah (http://solareis.anl.gov/).

Just as the regulatory landscape appears to be heading toward a more predictable, expedient system of authorizations, however, opposition to solar development by tribes and other stakeholders is on the rise and has turned litigious. To continue reading, click here.

Trackbacks (0) Links to blogs that reference this article Trackback URL
http://www.lawofrenewableenergy.com/admin/trackback/236216
Comments (0) Read through and enter the discussion with the form at the end
Post A Comment / Question Use this form to send a comment to the editor. Please do not include any information that you or someone else considers to be confidential in nature. Without prior establishment of an attorney-client relationship, unsolicited messages containing confidential information cannot be protected from disclosure.







Remember personal info?
Send To A Friend Use this form to send this entry to a friend via email.