On May 13, 2024, at a special transmission reform meeting, the Federal Energy Regulatory Commission (FERC or Commission) issued Order No. 1920 “Building for the Future Through Electric Regional Transmission Planning and Cost Allocation” (Final Rule).[1] The Final Rule builds upon Order No. 888, Order No. 890, and Order No. 1000, which developed