The Pacific Northwest Economic Region (PNWER) Energy Storage Coaliation (ESC) will be holding an important energy storage conference at the Portland Convention Center on October 8, 2012.  ESC has worked with the Oregon and Washington public utility commissions to bring together a diverse mix of developers, utilities and regulators to share their perspectives on opportunities and barriers

For those who like to pay close attention to developments in the energy storage industry, take a look at Stationary Electricity Storage, which collects and presents articles about storage industry news, noteworthy projects, and other topics.  It’s well organized (with articles filtered by category, storage provider, organization and location), offers a free daily newsletter and looks like a

The Electric Power Research Institute (EPRI) is developing a new report to define functional requirements for customer energy storage systems (CESS). The project is engaging energy storage stakeholders to collaborate on the development of the functional requirements through a public process.

EPRI’s effort is designed to create an understanding between electric utilities and their storage

The 2011 IEPR Committee Workshop on Energy Storage for Renewable Integration was held Thursday, April 28th at the California Energy Commission (CEC) offices in Sacramento.  The Workshop was presented in a three panel format, with each panel addressing specific topics, including (1) the need for energy storage in light of California’s renewable portfolio standard, greenhouse

As we’ve previously discussed, California’s AB 2514 requires the CPUC and municipal utilities in California to open proceedings by March 1, 2012 to determine appropriate targets, if any, for the procurement of viable and cost-effective energy storage systems by load-serving entities. Over a year before that deadline, the CPUC opened Rulemaking 10-12-007 in December of last

Electric Power Research Institute (EPRI) and Technology Transition Corporation recently issued a request for information (RFI) to prepare for multiple demonstrations and the market introduction of 1MW / 2MWh lithium ion battery energy storage systems (ESS) for electric utility grid management solutions.  EPRI and TTC have assembled a utility team for this project, and they encourage manufacturers

On August 12, 2010, Energy Secretary Steven Chu announced a new loan guarantee solicitation for renewable energy manufacturing projects.  The Commercial Technology Renewable Energy Manufacturing Projects solicitation (the "Solicitation") is supported by the American Recovery and Reinvestment Act (the "Recovery Act") through Section 1705 of the Loan Guarantee Program and is focused primarily on providing new green energy jobs and the deployment of renewable energy technologies that reduce greenhouse gas emissions.

The solicitation specifically identified "Eligible Projects" to include renewable energy manufacturing projects or facilities located in the United States that:

  • Manufactures Commercial Technology products that support the generation of electricity or thermal energy from renewable resources;
  • Has Project Costs greater than seventy-five million dollars ($75,000,000);
  • Is able to obtain a credit rating equivalent of "BB" or better from Standard & Poor’s or Fitch, or "Ba2" or better from Moody’s, as evaluated without the benefit of any DOE guarantee or any other credit support;
  • Will create or retain jobs in the United States; and
  • Otherwise meets all applicable requirements of Title XVII, including Section 1705, the Solicitation, including all attachments and all applicable requirements of the Recovery Act.

The Solicitation also provided, for illustrative purposes, examples of the types of Eligible Projects that may qualify, which include the following:

  • wind energy component or systems manufacturing facilities;
  • solar photovoltaic (PV) component or system manufacturing facilities;
  • concentrated solar power component or system manufacturing facilities;
  • hydropower component or system manufacturing facilities;
  • geothermal component or system manufacturing facilities;
  • other geothermal power cycle component or system manufacturing facilities; or
  • ocean wave, tidal, and river current (e.g. hydrokinetic) component or system manufacturing facilities

Continue Reading Clean Energy Jobs Focus of New Manufacturing Solicitation Issued by the DOE

From our colleagues Beverly Pearman and Jeremy Sacks:

Mitsubishi Heavy Industries, Ltd. and Mitsubishi Power Systems Americas, Inc. v. General Electric Company

On May 20, 2010, Mitsubishi Heavy Industries, Ltd. (“MHI”) and Mitsubishi Power Systems Americas, Inc. (“MPSA”) (collectively “Mitsubishi”) filed suit in the U.S. District Court for the Western District of Arkansas contending that General Electric Company (“GE”) is engaged in a scheme to monopolize the sale of variable speed wind turbines in the United States in violation of state and federal statutes. They seek a compensatory damages award in excess of $100 million, an award of treble damages, punitive damages, and a permanent injunction prohibiting further litigation by GE for infringement of specified patents that GE claims to own. Mitsubishi’s claims are brought pursuant to Section 2 of the Sherman Act, Section 43(a) of the Lanham Act, and a state law claim of tortious interference with contractual and prospective business relationships.Continue Reading Mitsubishi Alleges that General Electric, Co. Is Engaging in Anti-Competitive Behavior in the Variable Speed Wind Turbine Market